Donations made by the alumni to the new building of the Department of Computer Science

Wall mounted Batch Photos of alumni from 1991 to 2021. Customized circuitry design with QR code for the details of each batch. Fixed in the lobby of the first floor.

Donated by: Batch 2009/2010

Cost: LKR 190,000.00

3D DCS logo in the lobby of the main entrance

Donated by: Batch 2010/2011

Cost: LKR 300,000.00

3D DCS logo fixed at the rooftop with the water tank

Donated by: Batch 2011/2012

Cost: LKR 130,000.00

3D name board of “Department of Computer Science”

Donated by: Batch 2013/2014

Cost: LKR 195,000.00

Keyboard-like backlit Key Holder fixed in Ground Floor

Donated by: Batch 2014/2015

Cost: LKR 127,000.00

Wooden made PC Repairing Table placed in First Floor

Donated by: Batch 2014/2015

Cost: LKR 50,000.00

20 Nos. of CCTV security cameras, 32-Channel NVR, 6TB HDD, IP 65 Boxes, and installation charges

Donated by: Batches 2015/2016, 2007/2008, 2013/2014 and 2011/2012

Cost: LKR 163,000.00 + 125,000.00 + 80,000.00 + 30,950.00 = LKR 398,950.00

Audio System for the Auditorium

Donated by: Batch 1992/1993

Cost: LKR 329,500.00

Sofa Set (1+1+3) and Coffee Table for Office

Donated by: Batch 2008/2009

Cost: LKR 107,370.00 + 11,317.50 = LKR 118,687.50

3 Small Wall Clocks and a large wall clock for common places

Donated by: Batch 2008/2009

Cost: LKR 6,900.00 + 4,000.00 = LKR 10,900.00

12 Nos. of Visitor Chairs

Donated by: Batches 2001/2002 and 2008/2009

Cost: LKR 106,245.00 + 114,345.00 = LKR 220,590.00

10 Nos. of high back chairs for Seminar Room

Donated by: Batches 2003/2004 and 2009/2010

Cost: LKR 180,022.50 + 77,152.50 = LKR 257,175.00

6 Nos. of Visitor Chairs

Donated by: Batch 2001/2002

Cost: LKR 117,045.00

Rubber Mats

Donated by: Batch 2001/2002

Cost: LKR 11,200.00

Sandblast Stickers for glass door at entrance and 29 Nos. of wooden doors with glass

Donated by: Batch 1996/1997 and 1997/1998

Cost: LKR 53,500.00

2 Nos. of 6’×4’ whiteboards for the Auditorium

Donated by: Batch 1996/1997 and 1997/1998

Cost: LKR 17,000.00

Microwave Oven (20L)

Donated by: Batch 2005/2006 & 2006/2007

Cost: LKR 30,890.00

Wooden Dining Table with Six Chairs

Donated by: Batch 2005/2006 & 2006/2007

Cost: LKR 115,258.75

Wooden Table for Group Discussion

Donated by: Batch 2005/2006 & 2006/2007

Cost: LKR 43,391.25

Two-tone Stone Seats (2+2+1+1) with Table

Donated by: Batch 1996/1997 & 1997/1998

Cost: LKR 41,000.00

Armless Stone Seats (3+3) with Table x 2 sets

Donated by: Batch 1996/1997 & 1997/1998

Cost: LKR 52,000.00

Stone Seats with Arm (2+2)

Donated by: Batch 1996/1997 & 1997/1998

Cost: LKR 17,800.00 + 3,200.00

Mesh-type Floor Mats

Donated by: Batch 2005/2006 & 2006/2007 and 2009/2010

Cost: LKR 8,550.00 + 6,000.00 = 14,550.00

DCS Park

Donated by: Batch 1996/1997 & 1997/1998

Cost: LKR 173,250.00

Executive Table for the Head’s Room

Donated by: Batch 1995/1996

Cost: LKR 240,000.00

Noticeboard

Donated by: Batch 2004/2005

Cost: LKR 55,000.00

2 Nos. of Steel fabricated cupboards for IoT Laboratory

Donated by: Batch 2004/2005

Cost: LKR 110,000.00

Lectern for Laboratory

Donated by: Batch 2004/2005

Cost: LKR 30,000.00

DCS logo printed 30 Nos. of B&B Plates

Donated by: Batch 2004/2005

Cost: LKR 29,700.00

Frames for Computer Science Student Photographs

Donated by: Batch 2004/2005; 1996/1997 & 1997/1998

Cost: LKR 30,000.00 + 12,000.00

Lectern for Auditorium

Donated by: Batch 2001/2002

Cost: LKR 40,000.00

Head Table for Auditorium

Donated by: Batch 1996/1997 & 1997/1998

Cost: LKR 132,000.00

DCS logo printed Tea Cup & Saucer and Crockery Sets

Donated by: Batch 2012/2013

Cost: LKR 61,740.00

Mammoty and Lawn Rake

Donated by: Batch 2014/2015

Cost: LKR 3,600.00

Donated by: Batch 1995/1996

Cost: LKR 65,000.00

Overall Details

Batch No Academic Year Contribution (LKR)
01 1990/1991 454,000.00
02 1991/1992 --
03 1992/1993 357,150.00
04 1993/1994 --
05 1994/1995 --
06 1995/1996 240,000.00
07 & 08 1996/1997 & 1997/1998 501,750.00
09 1998 - 1999 --
10 1999 - 2000 --
11 2000 - 2001 --
12 2001/2002 274,490.00
13 & 13A 2002/2003 & 2002/2003 --
14 2003/2004 180,022.50
15 2004/2005 254,700.00
16 & 17 2005/2006 & 2006/2007 198,090.00
18 2007/2008 125,000.00
19 2008/2009 243,932.50
20 2009/2010 273,152.50
21 2010/2011 300,000.00
22 2011/2012 160,950.00
23 2012/2013 61,740.00
24 2013/2014 275,000.00
25 2014/2015 180,600.00
26 2015/2016 163,000.00
Total 4,243,577.50